what is right time of slab DE shattering and beam boo tam.
Answer Posted / ananth
span length below 4.5m 7 days
span length over 4.5m 14days
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to nfind out the specific gravity of sand.aggregate,water please help...
What is meant by dimensioning?
What is the purpose of Chipping in the heavy foundation?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
How to do base isolation using ETABS software?
difference between trapezoidal and pedestal footing and how the load acts on that
I have an span length 16 ft c/c
How to calculate Volume of Wet cement concrete for a specific grade?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
How to plan a project
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
how to control PQI (Project Quality Index)
Soil bearing capacity formula
sir, whitch is the best book (writer name) for prepration of gate....