what is right time of slab DE shattering and beam boo tam.

Answer Posted / ananth

span length below 4.5m 7 days
span length over 4.5m 14days

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to nfind out the specific gravity of sand.aggregate,water please help...

1683


What is meant by dimensioning?

648


What is the purpose of Chipping in the heavy foundation?

995


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

1535


How to do base isolation using ETABS software?

2479






difference between trapezoidal and pedestal footing and how the load acts on that

2336


I have an span length 16 ft c/c

1057


How to calculate Volume of Wet cement concrete for a specific grade?

1767


How much area will be covered in 1 litre of Velvet touch paint in normal wall condition

940


How to plan a project

1711


how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.

1654


suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?

1662


how to control PQI (Project Quality Index)

9812


Soil bearing capacity formula

1212


sir, whitch is the best book (writer name) for prepration of gate....

1203