what is right time of slab DE shattering and beam boo tam.
Answer Posted / ananth
span length below 4.5m 7 days
span length over 4.5m 14days
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
400 ku d/c clearess ketan hota hai?
Who name us Engineer & Why?
What in your past experience or education prepares you for the position for which you are applying
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
density of crush sand & crush stone or grit powder
what is that one cub metre plaster in cemant and fine sand
what is the basic difference between Coloumn & Shear Wall
How can we make a hole in a solid rectangle using solidsworks?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
Moisture content calculation for diff mix ratio's ??
at what pressure ply-wood is obtained by gluing wooden sheets
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
What are the benefits of rcc pipes over steel designed pipes?
All aptitude question of Bechtel
What are the RISKS during the project construction?