what is right time of slab DE shattering and beam boo tam.
Answer Posted / ananth
span length below 4.5m 7 days
span length over 4.5m 14days
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Explain what is progress payment?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
How much does the leaning tower of pisa lean?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
What are the steps involved in the concreting process?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
Mention different types of roof systems?
what is the 0 value in quantity surveying
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
rate analysis for cement pointing 1:4 , for 100 sq m
Formula for calculation volume of essentric footing
Why concrete barriers have curved surface profiles?
How do you measure water flowing through 300mm diameter pipes?