what is right time of slab DE shattering and beam boo tam.
Answer Posted / md nezam
DE shattering can be done for slab bottom after 3days and Beam bottom after 7 day,but immediately props to be refixed.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
what is the difference between prime coat and tack coat in road construction
What are the different softwares used for cad?
What glue is least sticky?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
What are new methods /technologies of pothole patching?
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
what will be price of 1:2:4pcc per kg?
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
what are RIB slabs explain about it
Differentiate first angle & third angle projection?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?