what is right time of slab DE shattering and beam boo tam.
Answer Posted / md nezam
DE shattering can be done for slab bottom after 3days and Beam bottom after 7 day,but immediately props to be refixed.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
I need to constructive work in amaraj batteries
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
What is meant by cartesian coordinate system?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
How to hide dimensions in autocad?
What is command line?
What is an object snap mode?
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
What is packing Factor ?
What is rate of concrete surface rendering work per sqm
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
give me the rate analysis for Bituminous Macadam and SDBC
What are the advantages of cad?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?