what is right time of slab DE shattering and beam boo tam.
Answer Posted / md nezam
DE shattering can be done for slab bottom after 3days and Beam bottom after 7 day,but immediately props to be refixed.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
Explain what is change order request?
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
How are freeway bridges built?
How is the leaning tower of pisa supported?
IS code for Rolling Margin of steel
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
What is the difference between built area and super built up area?
What is rolling stock
what is Brest Wall?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
IS code for grade of concrete for bamboo lintel????
How to find out kg per Sft ?