what is right time of slab DE shattering and beam boo tam.
Answer Posted / sagar tiwari
span length over 6m than 28 days
span length below 6m than 14 days
span length over 4.5m than 14 days
span length below 4.5m than 7 days
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
rimmer in pile foundation
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
What is the different type of slump test indications?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
significance of specific surface area of particles?
How does siphoning work?
What is the compressive strength of fly ash bricks?
Which are the top apps for you civil engineer?
What is the distance between railway tracks?
How to calculate volume of concrete & steel on tank foundation & ring wall ?
What is the density of DLC & PQC and how it is differ from normal concrete?
Define What is the difference between routing maintenance and major maintenance in school facilities?
Describe the role of independent Quantity surveyor?
Are you ready to relocate with your immediate family to United States as a new employee?