what is right time of slab DE shattering and beam boo tam.
Answer Posted / sagar tiwari
span length over 6m than 28 days
span length below 6m than 14 days
span length over 4.5m than 14 days
span length below 4.5m than 7 days
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Rate analysis of Vitrified tile in cement mortor 1:3
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
I need to constructive work in amaraj batteries
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
What is the ideal size of the living room ranges from small to large size?
Water filter calculation formula
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
sir, whitch is the best book (writer name) for prepration of gate....
Explain the design for rcc multi-storied building?
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
how to calculate mivan shuttering matrial
residential buildings,mixing of concrete,structural,construction material,site handling.
what is the specific gravity of rubble in plum concert
Does VDF add strength to the flooring apart from preventing water ingress?