what is right time of slab DE shattering and beam boo tam.

Answer Posted / vinaysagar donakanty

The above answer were right but it is advisable to check strength of cubes at 3 days or 7 days or 14 days before deshuttering.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like

1542


what do you understand by M25 concrete

1925


could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!

1657


How many kilo-newtons equals 1000 kilogram?

664


What is missing report and how to prepare

1020






Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

1901


States some of the commonly used commands in cad software’s?

758


how we can find sieve #4 is 4.75mm?

1870


How to decide/consider the grade of bitumen for dbm.

1765


how to take concrete quantity for precast segment for viaduct project?

2574


Different sizes of Hollow blocks and its weight. Thanks.

1917


how many minimum admixtures are used in water froofing structures

1844


Tell me about triple point of water.

671


What is different between DI Pipe and CI pipe?

1576


Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?

1438