what is right time of slab DE shattering and beam boo tam.
Answer Posted / vinaysagar donakanty
The above answer were right but it is advisable to check strength of cubes at 3 days or 7 days or 14 days before deshuttering.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
What are segregation and bleeding?
Process of pcc in wateredug
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
how much required strength of cement concrete bricks(size 230x115x75mm)
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
What is the difference between engineering stress and true stress?
Why does the pressure increase under soil?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
what is the hanekom repairing material after concreting work
How do we calculate absolute pressure?