what is right time of slab DE shattering and beam boo tam.
Answer Posted / azam
The time of slab deshutting after getting 67% strength at 4 or 7 days same for beam bottom and it also depend of span of beam.
| Is This Answer Correct ? | 21 Yes | 3 No |
Post New Answer View All Answers
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
What is fineness modulus ? and its sieve # ?
what is total volume of ingredients used in concrete accordingly
Which is stronger solid steel rod or hollow steel pipe?
what is the difference between tsp & tower
how much quantity of cement,sand and water required for 1 sq feet flooring work .
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
how to caluclate sienerge qty in construction in ap
How we calculate the service time of buildings
What is the difference between EPC,DBOOT and BOOT.
In case if concrete box girder bridges how is the number of cells determined?