How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answers were Sorted based on User's Feedback
Answer / zuber ahmed
Volume of Dry Mortar = 35% of volume of Brickwork
Volume of Mortar required = 0.35 + 1 = 1.35 cu.m.
Cement required = 1/6 X 1.35 = 0.225 cu.m. =6.8Bags
Sand required = 5/6 X 1.35 = 1.125 cu.m.
Bricks required = 500 Nos.
| Is This Answer Correct ? | 10 Yes | 43 No |
what is grade slabs
definition of compressive strength. definition of compressive stress.
How to find permissible diagonal tensile stress in reinforced brick work
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
What are the benefits of rcc pipes over steel designed pipes?
insted of bentonite we can use any alternate material in piling ?
how the centre of gravity is used in construction?
How calculate the material in concrete mix in ratio 1:2:4 ?
why we are doing post tensioning in beams and slabs. it is economical compare to rcc? how?
what is workability,define it?
How many bricks,sand,cement in 1m3 bricks masonary
3 Answers Ascent, Superior Hi Tech,
how much percent are used 20mm,10mm?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)