How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / zuber ahmed
Volume of Dry Mortar = 35% of volume of Brickwork
Volume of Mortar required = 0.35 + 1 = 1.35 cu.m.
Cement required = 1/6 X 1.35 = 0.225 cu.m. =6.8Bags
Sand required = 5/6 X 1.35 = 1.125 cu.m.
Bricks required = 500 Nos.
Is This Answer Correct ? | 10 Yes | 43 No |
Post New Answer View All Answers
What is a projection line?
what is diversion?
Where is the worlds longest elevator and how long is it?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
How can i do RCC rate analysis?
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
3. What are the disadvantages of your present job, things you do not like about it?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
What are the techniques to measure road difference?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
Minimum concrete cover in slabs, columns, beams, foundation and other st?