how do you calculate the quantity of steel,cement for plinth
beam. (example size 41'*0.58'*1.08')
No Answer is Posted For this Question
Be the First to Post Answer
Pls. help. If a contract was awarded to a contractor in april 2012 with steel & cement base price as rs. 45/kg & 250/bag. Now in oct. 12 steel cement price becomes 55/kg & 290/ bag. How escalation will be calculated? Pls. tell complete calculation Regards,
what is stress
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
density of crush sand & crush stone or grit powder
How much quantity of water required for curing of: 1) For concrete of 10cu-m or 10sq-m 2) For blockwork of 10sq-m 3) For plastering of 10sq-m
How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.
1 Answers Aparna Constructions,
how much bags of cement will be in 1 cmt of having the ratio 1:3:6
wat is the necessity of finding shear and bending moment in a structure. wat will happen if it is not consider. other than shear cracks and deflection is there any other failure happen.
what is concrete
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
How much cement will require for 1Rmt Skirting laying
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)