Answer / shadavali123@gmail.com
H/3(A1+A2+underwrote 4AM) where is the h is the height of tepar of footing A1 is the area of column size area and A2 is the fotting is the base area AM is the mid point .so end
| Is This Answer Correct ? | 5 Yes | 4 No |
how many cement and sand required for 1m2 plastering 1:4 cm
what is M20 ?
3 Answers L&T, Sukhwani Constructions,
how to calculate the quantaty of steel in footing please show me detail procedure with the help of drawing
Steel Calculation for Footing, Beam & Columns?
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
What is the formula to calculate the volume of mortar required for a wall with 1245 blocks with a stndard size of 440x215x100?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
what is stress
How to calculate compressive strength of concrete cube dencity
5 Answers Shoba Devlopers, Sobha Developers,
In olden days reinforcing bars in concrete are not got rusted even till now. But recently provided steel getting rusted in concrete. what are the probable reasons?
How to convert N/MM2 TO KG/CM2
What is the difference between engineering stress and true stress?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)