Isolated square footing quantity calculations
Answers were Sorted based on User's Feedback
Answer / shadavali123@gmail.com
H/3(A1+A2+underwrote 4AM) where is the h is the height of tepar of footing A1 is the area of column size area and A2 is the fotting is the base area AM is the mid point .so end
| Is This Answer Correct ? | 5 Yes | 4 No |
rate of 1cum brick masonry please immidate
How to calculate sand,cement for 1:5ratio brick masonary
4 Answers IVRCL, Jamek, Prera Nirman Sewa, SPCL,
Describe a time when you anticipated potential problems and developed Preventive measures
0 Answers Graham Construction,
What is the density of steel? what is the IS code for steel structures? 1t/m2 = ?KN/m2 ??
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
0 Answers IVRCL, Techno Art Constructions,
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
what will be the difference in compressive test results for a 150 mm cube, a 150 mm cylinder and a 300 mm cube
What are the tests conducted on coarse aggregates ?
what is slope provided to lying the sewerage pipe of different dia ?
what is diffreant types of water proofing chemical tell me please
Which of the following countries is associated with the fighter plane 'Dassault Rafale' as its country of origin? A) Israel B) Italy C) France D) Germany
What is Dewatering ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)