In an aggregate blending plant, water is sprayed before
blending is performed. If the fine content in aggregate is
as high as 25 %, will not the fines form into lumps / balls
and distribution will not be uniform ? Further, the fines
will stick onto the interior of pug mill and its content
will be low. The mixed material is stockpiled for weeks /
months before use. Will it not be better that blending is
done in dry condition, and water will be added only during
compaction at site. Please forward your comments and
suggestions.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

I Have concrete mix with 440kg opc and having 37 mpa strengh in 7days while in 28 days only 42mpa can anybody tell me the reason for the same.

4 Answers  


five requirements of infill panels for walls?

0 Answers  


in m25 concrete what is m.

7 Answers   Godway,


WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10

0 Answers  


What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?

0 Answers   Kirloskar,






how to calculate estimation for puttey... give me an example

1 Answers  


what is Short bored pile foundation.

0 Answers  


I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?

0 Answers  


How t find the quantity of materials required for construction of a wall of length 10x5x0.2

2 Answers   NCC,


As a site engineer what do you check in foundation before concreting

3 Answers  


what is the factor of safety for cement and steel with reference to IS 456-2000. and min reinforcement should be provided for column and slab with reference to IS 456-2000.

5 Answers  


How do you calculate qty for form work like props shuttering sheet and acro span for residential block ? for Example: 10 sq mt what is the material and qty require to do form work.

2 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)