how many average of shuttering in one cubic meter concrete
Answers were Sorted based on User's Feedback
Answer / v.kapil
i understand your problem
if you want to calculate shuttering in a genral rasidential
building so you can consider 5-6 Sqm / Cum of conc. but
when you talking about foundation it reduced up to 2-3 Sqm/
Cum, ultimatly there is no as such thumb rule but we can
adopt a value by our experience...
Is This Answer Correct ? | 57 Yes | 6 No |
Answer / ilias mahammad
Shuttering Qty can be taken as approx.5-6 times the volume
of concreting.
i.e. for 1 cum of concreting approx. 5.00sqm-6.00sqm
shuttering is required.
Is This Answer Correct ? | 19 Yes | 3 No |
Answer / sjtbehera
look shuttering are done to cover the concrete to a
minimum period so that it will become hard. it's
calculation are done by sqft or sqmt. for one cubic mt
concrete it can calculate by covering the area of structure
in length x breadth or height.
Is This Answer Correct ? | 21 Yes | 9 No |
Answer / mrinal bose
Approximate Shuttering value 1:8.88 it is standard shuttering volume. The standard column size 300 mm X 450 mm, Slab thk is 125 mm, plinth beam 230 mm X 350 mm, Beam/ slab beam 230 mm X 450 and foundation shuttering will less then above average shuttering quantity 8.88 Sqm per cubic meter
Is This Answer Correct ? | 4 Yes | 2 No |
Answer / dalip kumar
for shuttering point of view, there is area of concrete work is important rather than it's volume, e.g. 1 c.m concrete
can be spread on the 2 sq.m and 1 sq.m that is why it design by covering area of the concrete.
Is This Answer Correct ? | 2 Yes | 17 No |
what are different grades of concrete and their classifications?
What is the approx construction cost of 1 lac Sq.ft ..in any place city or town?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
why mixing marble powder reduces setting time of cement
what is the technical word for column and beam joint
how many moisture content in well seasoned timber
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
What is modular elasticity?
how to estimate shuttering form work or how to take off material quantity???
how to convert ft3 to m3?
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?