Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many average of shuttering in one cubic meter concrete

Answer Posted / ilias mahammad

Shuttering Qty can be taken as approx.5-6 times the volume
of concreting.
i.e. for 1 cum of concreting approx. 5.00sqm-6.00sqm
shuttering is required.

Is This Answer Correct ?    19 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is anchorage length,lap length and (dont remember the last one)

2253


Why reinforcement done in shorter span in two way slabs

1864


a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement

2188


how to calculate number of bitumen for road asphalt

1596


pls mail some more tecnical qustions at msaranya2610@gmail.com

2145


How to find beam R/F cutting length

1878


what is the maximum number of course that can be laid according to IS code and the max height.

2137


What is the tensile strength of wood?

1262


it is possiblee to produce concrete with out cracks...

1943


cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

2233


What is the difference between yeild strength and compressive strength of steel???

2367


What are the types of slump?

1248


I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??

2402


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

1932


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1918