how many average of shuttering in one cubic meter concrete

Answer Posted / dalip kumar

for shuttering point of view, there is area of concrete work is important rather than it's volume, e.g. 1 c.m concrete
can be spread on the 2 sq.m and 1 sq.m that is why it design by covering area of the concrete.

Is This Answer Correct ?    2 Yes 17 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the distance between railway tracks?

693


can i get hindi version of is codes based on civil engineering?

3874


what is the max. area can we apply the plate load test ?

1921


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

1404


How to calculate unit weight of concrete for m40 grade.

3423






What are the techniques to measure road difference?

751


Slab quantity 

1601


PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.

1988


what is civil engineer greatest strength and weakness?

13364


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1761


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

1815


is concealed wiring a problem in fly ash brick wall?

2059


WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.

1571


How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work

3143


Formula for calculation volume of essentric footing

1260