how many average of shuttering in one cubic meter concrete
Answer Posted / mrinal bose
Approximate Shuttering value 1:8.88 it is standard shuttering volume. The standard column size 300 mm X 450 mm, Slab thk is 125 mm, plinth beam 230 mm X 350 mm, Beam/ slab beam 230 mm X 450 and foundation shuttering will less then above average shuttering quantity 8.88 Sqm per cubic meter
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
Slab quantity
How will you Engage Labours on Site?
Define aligned dimension?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
Define What is unit weight of normal concrete?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
pls mail some more tecnical qustions at msaranya2610@gmail.com
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
How do you measure water flowing through 300mm diameter pipes?
What is specific gravity???
What are the strongest shapes in building?
Which is the direction for positive angle?
What will you do if you encounter problems like accidents?