how many average of shuttering in one cubic meter concrete
Answer Posted / sjtbehera
look shuttering are done to cover the concrete to a
minimum period so that it will become hard. it's
calculation are done by sqft or sqmt. for one cubic mt
concrete it can calculate by covering the area of structure
in length x breadth or height.
Is This Answer Correct ? | 21 Yes | 9 No |
Post New Answer View All Answers
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
how is the reinforcement is distributed in triangular slab
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
What is the density of DLC & PQC and how it is differ from normal concrete?
What is the effect of a building collapse?
how to calculate MR 9(derivation)
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
What is type failure of road surface? how to repair the failure of road surface?
How much of the strength of concrete comes from post- production curing?
What is .Dwg?
What are the methods of measurement? Describe it shortly
dialation means
What is the method of soil replacement test?
How to calculate quanty of steel in four leg stirrups?