how many average of shuttering in one cubic meter concrete

Answer Posted / sjtbehera

look shuttering are done to cover the concrete to a
minimum period so that it will become hard. it's
calculation are done by sqft or sqmt. for one cubic mt
concrete it can calculate by covering the area of structure
in length x breadth or height.

Is This Answer Correct ?    21 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?

1913


how is the reinforcement is distributed in triangular slab

1760


how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?

1641


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2605


What is the density of DLC & PQC and how it is differ from normal concrete?

2993






What is the effect of a building collapse?

615


how to calculate MR 9(derivation)

2308


Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

661


What is type failure of road surface? how to repair the failure of road surface?

1973


How much of the strength of concrete comes from post- production curing?

2641


What is .Dwg?

851


What are the methods of measurement? Describe it shortly

1772


dialation means

1832


What is the method of soil replacement test?

1537


How to calculate quanty of steel in four leg stirrups?

1445