what is Fe415 & Fe5oo? also what are types of steel?
Answers were Sorted based on User's Feedback
Answer / shyam sundar mondal
high yield deform bar.characteristic strength 415 N/MM2, 500
N/MM2.Tork steel.
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / abdul
Answer
# 1 high yield deform bar.characteristic strength 415
N/MM2, 500
N/MM2.Tork steel.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / kalyanaraju
Fe415 & Fe500 means steel having proof stress 415N/MM2 & 500MM2 respectively.
| Is This Answer Correct ? | 2 Yes | 1 No |
fe 415 is the steel having tensile strength of 415N/MM2
similarly fe 500.
types of steel
mild steel-250 N/MM2
tor steel -415 "
tmt -500 "
torkari -550 "
TORKARI is a new brand and high strength and high bond
reinforcing steel conforming to Fe550 grade (Tor-55) of IS
1786 - 2008
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sjtbehera
Fe 415- that is tensile strength is 415 N/MMsq as per IS
456-200 and Fe 500 means tensile strength is 500N/mmsq
basically diffrence in strength. type of steel is TMT bar,
Tor Bar, CTB bar
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / prabaharan
IF Tensile strength is greater than 415 this steel is called Fe 415 ,this types mild steel- Fe250, Tmt bars- Fe415,Fe500.
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the difference between np2 and np3 concrete mix
0 Answers Sri Matha Constructions,
How to calculate carrying capacity of the existing water supply trunkmain
how to find hardness of water?why it should be determined?
how many express way in india
What is gravity flow?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
specific gravity of sand, coarse aggregate, cement.
What is the proportion of M30 to M80and which construction these are used
What is the formulae of percentage of steel
list out various type of codes:-
how many bricks,cement,sand of a 40*30*6 ft bowndry wall?
6 Answers Natco, NGO, OGDCL, SIL, Simplex,
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)