how many average of shuttering in one cubic meter concrete
Answer Posted / v.kapil
i understand your problem
if you want to calculate shuttering in a genral rasidential
building so you can consider 5-6 Sqm / Cum of conc. but
when you talking about foundation it reduced up to 2-3 Sqm/
Cum, ultimatly there is no as such thumb rule but we can
adopt a value by our experience...
Is This Answer Correct ? | 57 Yes | 6 No |
Post New Answer View All Answers
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
1m square 20mm plastering how much of water need curing work
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
What is the density of most of construction materials?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is called the inverd level of mabhole chamber?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
what is Short bored pile foundation.
to draw bm diagrams for portal frames under different loadings//
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
What is the difference between engineering stress and true stress?
Spider cracks occur in beam bottom due to––
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
how to control PQI (Project Quality Index)