concrete mix design for M 30 Grade..

Answer / maharshi

grades more than M25 should consists of mix designs so for
M30 grade mix design is necessary

Is This Answer Correct ?    58 Yes 15 No

concrete mix design for M 30 Grade..

Answer / tushar patel

AS per IS:456-2000,Concrete grade above M25 has to be
designed mix.for such higher grade W/C ratio,quality of
aggregates,admixtures are equaliy important parameters.So
M30 can never be designed in volumetric batching if
consistent quality control & strength is desired.

Is This Answer Correct ?    29 Yes 4 No

concrete mix design for M 30 Grade..

Answer / ramamurthy k l

Mix Design There are two types 1) Nominal mix
2)Design Mix
Nominal mix based in volume nad experience
Proportion 1:1.5:3
Design mix done using IS 10262 Code based on properties of
all ingredients ie sand aggregate water and cement finall
we are going arrive mix proportion in Wt.

Is This Answer Correct ?    43 Yes 21 No

concrete mix design for M 30 Grade..

Answer / eleyaraja

cment 390
20.00mm = 650
12.5mm = 450
river sand = 900
water =170

Is This Answer Correct ?    26 Yes 14 No

concrete mix design for M 30 Grade..

Answer / sandeep kumar

m30=1:1:1

Is This Answer Correct ?    9 Yes 7 No

concrete mix design for M 30 Grade..

Answer / soumya

Cement = 7.5 bags ( as per the cement content given 375
kg/m3)

sand content =0.45 m3
aggeregate =0.92 m3

Is This Answer Correct ?    19 Yes 19 No

concrete mix design for M 30 Grade..

Answer / ashalatha y

Proportion: 1:1:2

Quantity of Cement= 1440*0.92*2/4
=662.4 Kgs
=13.248 Bags
=13.5 or 14 Bags can be taken

Is This Answer Correct ?    39 Yes 70 No

concrete mix design for M 30 Grade..

Answer / deven bhat

1:1:2 is the logical mix design randomly used in mumbai &
costal part of india
cement consumption will be 500 kg for a M3 and water
requirement will be 300 ltrs for M3.

Is This Answer Correct ?    47 Yes 86 No

concrete mix design for M 30 Grade..

Answer / navinmorwal

5 N/mm sq.

Is This Answer Correct ?    7 Yes 51 No

Post New Answer

More Civil Engineering Interview Questions

what is the meaning of 40/20 src

0 Answers  


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

0 Answers   L&T,


use 1:1.5:3 concrete footing size 9'9" *9'9" and square 12" and also trapezoidal 22" use of 4 columns. calculate how much amount f concrete use. and also tell me the details about course aggregate and fine aggregate and cement bags use .(note; 20mm coures aggregate use)

1 Answers   CMS,


what ratio of cement and sand we used for making cover

4 Answers  


Why we do design mix of concrete when there is nominal method using the IS-Code available ?

14 Answers   Engineers India Limited,






different types of rcc slab

3 Answers  


How to increase a bearing capacity of soil?

0 Answers  


how many type of admixtures for water stored structure?

0 Answers   IVRCL,


How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.

0 Answers   IVRCL, L&T,


what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete

0 Answers  


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

0 Answers   Sumadhura Infracon,


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)