why their is need of production version
Answers were Sorted based on User's Feedback
Answer / rasika deshpande
In production version, we assign the BOM and ROUTING
combination. And in case of alternate BOMs , it clears which
alternative bom has to be selected automatically.
Is This Answer Correct ? | 18 Yes | 1 No |
Answer / bharathish
Production version is a combination of BOM and Master
Recipe..which determines the production method means which
combination of BOM & Routing needs to be selected is
determined by production version...
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / lalitshelare
Yes exactly it is correct.
thanks rasika as u posted the answer.
lalit
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / varun jalota
One more important thing that we cant forget is that
Production Version also plays a very important roll in Lot
Sizing and Validity
In addition with above explain like interlinking with BOM
Alternate BOM and Routing.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / louis
Production versions is also used when:
- Routings; more than one Production line is used (with
different Costs),
- Alternative BOM's: is used to produce the same Finished
product, Example: in Pharmacutical 2 different chemicals
can be used to manufacture "Disprin's" etc.
*** It is defined in the Material Master & Production
Order.
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / gobinath r
Production Version:
Alternative Routing with alternative BOM selected upon the
lotsize for better production efficency.for example the
company may have different production methods for different
lot size produced.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / shahid hussain
Beside all above answers I would add following:
It helps Standard Cost Estimate to be maintained on a
selected BOM and Routing (Production Version), can be fixed
in Material Master Costing 1 Tab
It Helps Planning for MRP to maintain the quota arrangement
for procurement proposals which is important for supply
chain planning and execution
Also help to avoid change/delete your master data (BOM
Routing etc) by controlling it through production versions
validity depending on
Lot Size
Validity Date
Help to have production planning by means of using line loading
Also help for mix costing ratios on mix costing scenario
Is This Answer Correct ? | 0 Yes | 0 No |
Explain customer Independent requirement .
Define ‘bom group’?
What do you mean by pooled capacity?
Which BOM maintenance functions do you require (copy functions, mass changes, and so on)?
What are the common questions,asked at SAP PP Full time face to face interview?
how many times pcc can run for one material?
What is significance of various manufacturing strategies?
Explain Flexible planning Procedure?
What is the difference between stock transfer order and stock transport order ?
Explain what is the need of mrp list if the stock requirement list is already given?
Explain what is routing in sap pp?
What is mrp list and what is the use of it?