Answer Posted / bharathish
Production version is a combination of BOM and Master
Recipe..which determines the production method means which
combination of BOM & Routing needs to be selected is
determined by production version...
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What is the use of QM control key?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
Define stock requirement
What do we do in realization phase?
What is Phantom Assembly?
Explain Flexible planning Procedure?
In implementation stage tell some standard scenario before AS-Is & TO-BE
What is scheduling
SPRO path for order, confirmation or requirement class.
What is alternate item group?
Can't one material be assigned to more than one operation in a routing, why?
What are the three 'mrp procedures'?
What are all the ‘technical types of bom’?
In lsmw which is most important step?
Difference between standard cost and variable cost.