Answer Posted / gobinath r
Production Version:
Alternative Routing with alternative BOM selected upon the
lotsize for better production efficency.for example the
company may have different production methods for different
lot size produced.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What are dynamic actions? Give a few examples. What are it’s you used in them?
What is plm (product lifecycle management) in sap pp and what is the use?
a company needs 12 standard values. how it can be maintained?
Difference between MD01, MD02 and MD03.
Explain what happens to plan after it has been converted into production order?
What is recursive BOM
Explain Flexible Planning procedure or How many levels of Flexible planning.
How does sap know that an operation has components as indicated by the component allocation indicator?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
Question related to Production order status or status profile?
What is the use of sap material view and list out other parameters where sap material view is applicable?
What are gaps? Some examples?
What is MRP procedure
Splitting of production order & product version