Answer / chaithanya
Integration of PP with MM is at the MRP stage, ie when the
material in stock is not at the required quantity, the
material request is sent to MM people.
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / c.kartikeshwar
SAP PP and MM integration is starts with Material Availability check.And also when MRP run for Reorder point( Can be automatic or Manaual).
MRP2 view and MRP 3 view in Material Master the PP and MM integration is mostly linked
Is This Answer Correct ? | 0 Yes | 0 No |
Define ‘bom group’?
Why work scheduling view is required for semi-finished and finished products?
In project the customization is comes under which phase?
What are the levels of batch, explain batch determination process?
If MRP type PD/ND in material master how will work flow.?
What is availability check? How can it be done?
What is mrp procedure
Can you dispatch capacity for a single work center
Where have we to specify the teardown time in one operation?
What is the use of plm (product lifecycle management) in sap pp?
Explain Flexible planning Procedure?
Integration between PP and QM Module.