Answer Posted / shahid hussain
Beside all above answers I would add following:
It helps Standard Cost Estimate to be maintained on a
selected BOM and Routing (Production Version), can be fixed
in Material Master Costing 1 Tab
It Helps Planning for MRP to maintain the quota arrangement
for procurement proposals which is important for supply
chain planning and execution
Also help to avoid change/delete your master data (BOM
Routing etc) by controlling it through production versions
validity depending on
Lot Size
Validity Date
Help to have production planning by means of using line loading
Also help for mix costing ratios on mix costing scenario
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the planning time fence?
Difference between Manual reorder point and Automatic reorder point.
Mention what is the purpose of using capacity planning?
Where have we to specify the teardown time in one operation?
What is the standard info set?
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
What does a PP Consultant do in his/her real time?
Can’t one material be assigned to more than one operation in a routine?
What are gaps? Some examples?
In the monthly lot size proc, how to generate lot at the end of Period?
What is recursive BOM
What are the types of MIC?
What is the difference between pp and pp-pi? Which one is better and how ?
What is a 'product hierarchy'?
What does the use of ms70 followed by mcec get you?