9*9 1:4:8 ratio using for p cc work please tell quantity
40mm aggregate ,sand &cement
Answers were Sorted based on User's Feedback
Answer / manikandan ramia sankaran
1. 9.00m x 9.00m x .15m
= 12.15 m3
12.15/(1+4+8)[x] 1.56 = 1.458m3 of cement
sand = 4 x 1.458 = 5.832 m3 of sand
4omm agg = 8 x 1.458 = 11.664 m3
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / bala
1. Consider 9.000m*9.000m*0.150m
Volume - 12.15Cu.m
* Cement - 41.31 Bags
* Sand - 6.075 Cu.m
* c.agg - 12.15 Cu.m
| Is This Answer Correct ? | 4 Yes | 5 No |
9*9*0.30m(assume your units) =24.3cum
cement=84.66 say-85 bags
sand=406.87 cft say-4.06 units
coarse aggregate=800.92 say-8 units
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / vikas
SUPPOSE - 9.00mtr.X 9.00mtr.X 0.20mtr. = 16.20 cum.
concrete.
Cement = 55.18 bags
fine aggregate (sand) = 7.72 cum.
coarse aggregate (metal) = 15.45 cum.
| Is This Answer Correct ? | 1 Yes | 4 No |
Answer / n.lakshmanan
9*9*.100=8.1m3
cement-26.244Bags
sand-67.29cft
40mm aggregate-134.58cft
| Is This Answer Correct ? | 0 Yes | 6 No |
how do we calculate wastage of steel in the site,what r the items to taken into account for wastage calculation?
What is the maximum allowable 'Silt content' in River sand
16 Answers IVRCL, Om Buildcon,
Providing and constructing 150 mm thick brick masonry with brick in cement mortar ( 1:4 ) in partition walls, pilars, pedestals,supports etc. at all floors including RCC band at 1.0 M intervals, including scaffolding racking out joints and watering cleaning complete in sqm. Providing and constructing 230 mm thick brick masonry in Cum Providing and constructing 460 mm thick brick masonry in Cum Please provide me the rates..
tell me height of colum casting if slab height 3mtr beam thikness 500mm and slab thik 150mm please write formula sir
What do you mean by "M-30"?
What is cement-concrete ratio ?
what is slope provided to lying the sewerage pipe of different dia ?
how to find water-cement ratio perfectly proportions M20, M25, M30
what is meant by pqc
2 Answers APCO, Sunil Hitech Engineers,
how we can say that concrete is a plastic concrete
whate the size of bricks are avalable at site
Factor of safety for steel should be based on its yield stress or its ultimate stress and factor of safety for concrete should be based on its ultimate stress or its yield stress?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)