Answer / manikandan ramia sankaran
1. 9.00m x 9.00m x .15m
= 12.15 m3
12.15/(1+4+8)[x] 1.56 = 1.458m3 of cement
sand = 4 x 1.458 = 5.832 m3 of sand
4omm agg = 8 x 1.458 = 11.664 m3
Is This Answer Correct ? | 7 Yes | 2 No |
Answer / bala
1. Consider 9.000m*9.000m*0.150m
Volume - 12.15Cu.m
* Cement - 41.31 Bags
* Sand - 6.075 Cu.m
* c.agg - 12.15 Cu.m
Is This Answer Correct ? | 4 Yes | 5 No |
9*9*0.30m(assume your units) =24.3cum
cement=84.66 say-85 bags
sand=406.87 cft say-4.06 units
coarse aggregate=800.92 say-8 units
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / vikas
SUPPOSE - 9.00mtr.X 9.00mtr.X 0.20mtr. = 16.20 cum.
concrete.
Cement = 55.18 bags
fine aggregate (sand) = 7.72 cum.
coarse aggregate (metal) = 15.45 cum.
Is This Answer Correct ? | 1 Yes | 4 No |
Answer / n.lakshmanan
9*9*.100=8.1m3
cement-26.244Bags
sand-67.29cft
40mm aggregate-134.58cft
Is This Answer Correct ? | 0 Yes | 6 No |
Stringer How many cm goes to landind
what is the creep in concrete
how many blocks will come per 1 meeter squear
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
Providing and constructing 150 mm thick brick masonry with brick in cement mortar ( 1:4 ) in partition walls, pilars, pedestals,supports etc. at all floors including RCC band at 1.0 M intervals, including scaffolding racking out joints and watering cleaning complete in sqm. Providing and constructing 230 mm thick brick masonry in Cum Providing and constructing 460 mm thick brick masonry in Cum Please provide me the rates..
Why there is no use of sea water in producing electricity
What is difference between MS and Tor steel ?? Please ellobrate...or state its charactersitcs??
4 Answers CLG, Indiabulls, TOR,
why breadth of beam is shorter than (or equal to )its depth?
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
How we decide the depth and size of footing? Give a example?
What is the minimum size of the particles of silt soil?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?