9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement..

Answer / g.aravinda kumar

pls confirm 9*9 is in mm or M.

Is This Answer Correct ?    13 Yes 4 No

9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement..

Answer / manikandan ramia sankaran

1. 9.00m x 9.00m x .15m
= 12.15 m3

12.15/(1+4+8)[x] 1.56 = 1.458m3 of cement
sand = 4 x 1.458 = 5.832 m3 of sand
4omm agg = 8 x 1.458 = 11.664 m3

Is This Answer Correct ?    7 Yes 2 No

9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement..

Answer / puneet

wt is 9*9 here?

Is This Answer Correct ?    2 Yes 3 No

9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement..

Answer / bala

1. Consider 9.000m*9.000m*0.150m
Volume - 12.15Cu.m

* Cement - 41.31 Bags
* Sand - 6.075 Cu.m
* c.agg - 12.15 Cu.m

Is This Answer Correct ?    4 Yes 5 No

9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement..

Answer / tn.vijayaraj

9*9*0.30m(assume your units) =24.3cum

cement=84.66 say-85 bags

sand=406.87 cft say-4.06 units

coarse aggregate=800.92 say-8 units

Is This Answer Correct ?    0 Yes 2 No

9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement..

Answer / vikas

SUPPOSE - 9.00mtr.X 9.00mtr.X 0.20mtr. = 16.20 cum.
concrete.

Cement = 55.18 bags
fine aggregate (sand) = 7.72 cum.
coarse aggregate (metal) = 15.45 cum.

Is This Answer Correct ?    1 Yes 4 No

9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement..

Answer / dhananjay yadav

.55m3

Is This Answer Correct ?    0 Yes 6 No

9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement..

Answer / n.lakshmanan

9*9*.100=8.1m3
cement-26.244Bags
sand-67.29cft
40mm aggregate-134.58cft

Is This Answer Correct ?    0 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

Stringer How many cm goes to landind

0 Answers   ACC,


what is the creep in concrete

4 Answers   L&T,


how many blocks will come per 1 meeter squear

9 Answers  


Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever

0 Answers  


Providing and constructing 150 mm thick brick masonry with brick in cement mortar ( 1:4 ) in partition walls, pilars, pedestals,supports etc. at all floors including RCC band at 1.0 M intervals, including scaffolding racking out joints and watering cleaning complete in sqm. Providing and constructing 230 mm thick brick masonry in Cum Providing and constructing 460 mm thick brick masonry in Cum Please provide me the rates..

1 Answers  






Why there is no use of sea water in producing electricity

20 Answers   Infosys,


What is difference between MS and Tor steel ?? Please ellobrate...or state its charactersitcs??

4 Answers   CLG, Indiabulls, TOR,


why breadth of beam is shorter than (or equal to )its depth?

8 Answers   CCCL,


IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN

0 Answers   Ravi Group,


How we decide the depth and size of footing? Give a example?

1 Answers  


What is the minimum size of the particles of silt soil?

0 Answers  


what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)