What are the grade of steel used in the steel design.?
Answers were Sorted based on User's Feedback
Answer / sjtbehera
grade of steel are used as per IS standard is Fe-415
Is This Answer Correct ? | 61 Yes | 19 No |
Answer / maheswaran
Fe 415
Fe 500
Fe 550
the above grade of steel used in steel design
Is This Answer Correct ? | 31 Yes | 6 No |
Answer / ash
the correct answer is fe 250 is used for structural steel
design alo fe 450 and 500 can be used. and fe 250,415 and
500 are grade of reinforcment not structural steel please
read question carefully
Is This Answer Correct ? | 22 Yes | 0 No |
Answer / naveen kumar
grade of steel for steel design is fe-415 according to IS
code
Is This Answer Correct ? | 10 Yes | 0 No |
Answer / er.mahadir mohamed
in market Fe 250, 415,500, 500plus available. in generally
all structural engg should recommend fe 415 upto G+2 floor
building, and G+3 to upto G+7 recommend Fe500, in Earth
quake area engg should recommend Fe 500plus
Is This Answer Correct ? | 2 Yes | 1 No |
how to calculate the cement, sand, coarse aggregate required for one cubic meter of concrete?
what the length we reduce for 45deg. bend for each side bend of bar.we know the 2d in case of 90 deg. bend.give clarification also?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
0 Answers Vishal Pipeline And Engineering,
Need advice for steel in kg for RCC Slab qty 35.64m3 and Beam/ column qty 35.39m3
How we calculate the service time of buildings
how to create our resume?
0 Answers Sunraj Construction,
What is PQC. Means PQC
14 Answers Era Infra Engineering, L&T,
what is the voice of ratio ?
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
may i know the detailed description of cutting length
What is steel requirement for one cum concrete