9*9 1:4:8 ratio using for p cc work please tell quantity
40mm aggregate ,sand &cement
Answer Posted / n.lakshmanan
9*9*.100=8.1m3
cement-26.244Bags
sand-67.29cft
40mm aggregate-134.58cft
| Is This Answer Correct ? | 0 Yes | 6 No |
Post New Answer View All Answers
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
what is moment-curvature relationship in semi rigid connections??
procedure for preliminary selection of size of column of 5 storey building
what is w/c ratio in dry lean concrete for m10 mix design
What is the cemnent ratio
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
What happens to Load at yielding ?
what is stressing
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
how pumping of concrete effects the quantity of material used in it?
what is the construction cost for per cft of multistorryed building in kolkata?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
RR masonry rate analysis