In reclamation works what are the importance of geotextiles and sand?
No Answer is Posted For this Question
Be the First to Post Answer
What is the unit weight of cement,sand,Brick,Reinforcement concrete
IN LOW RISE BUILDING PER SQ FT HOW MANY MATERIAL REQ. SAND &CONCREATE&CEMEBT
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
What is a BBS?Find out the cutting length for a foundation size 600 x 600, cover 50 mm?
How to calculate the crank rod in slab
0 Answers Bridge and Roof, Krishna Constructions,
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
give me the rate analysis for Bituminous Macadam and SDBC
what"s the minimum content cement allowed in RCC?
11 Answers ABC, L&T,
10x10 slab design
how to calculate quantities of sand , cement & aggregate in 1m3 - M20 , 1m2 of 6mm/12mm/20mm plaster , 1m3 20cm/ 1m2 of 10cm brick wall, paint quantity for 1m2 snowcem and lime painting?
3 Answers DCPL, EverSun, Pace Power Systems, Sobha Developers,
how much lap we should provide in columns for Fe-500?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)