9*9 1:4:8 ratio using for p cc work please tell quantity
40mm aggregate ,sand &cement

Answer Posted / tn.vijayaraj

9*9*0.30m(assume your units) =24.3cum

cement=84.66 say-85 bags

sand=406.87 cft say-4.06 units

coarse aggregate=800.92 say-8 units

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is civil enginnering & what you need of this course?

1790


GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?

6830


How much quantity water should be placed in one cubic meter area?

891


Define What is the distance between railway tracks?

677


To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?

1497






how many running meters in one kilogram of 4mm pvc coated chainlink fencing

633


Different sizes of Hollow blocks and its weight. Thanks.

1917


significance of specific surface area of particles?

1632


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2608


What are new methods /technologies of pothole patching?

1875


What is the difference between Grade I, II and III of GSB?

1888


what is castigliano theaorem

1827


psc girder detail

2707


how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

2256


What do you mean by tolerance factor of concrete ?

2667