What height of a 3.5 m high 300 x300 mm proposed col. can
be casted at a time ?
Answers were Sorted based on User's Feedback
Answer / sjtbehera
According to IS code In acolumn minimum height of casting
is 1200mm or 4' (apporox)
| Is This Answer Correct ? | 18 Yes | 4 No |
Answer / kamlesh chauhan
we can not caste any ht more than 2.4 mt at a time,you can
caste only 2.4 mt ht at a time,because vertical drop of
concrete should not be more than 2.4 mt due to seggregation
problem.
| Is This Answer Correct ? | 17 Yes | 9 No |
Answer / ajeet kumar bhatnagar
As per IS. concrete should not pour more than 1.5mtr hight
but if you are pouring by pump using hose pipe you can fall
concrete up to 1.5mtr height and col.up to 3.0 mtr. height
can be casted.
| Is This Answer Correct ? | 10 Yes | 2 No |
Answer / ajeet kumar bhatnagar
As per the I.S.code concrete should not pour greater than
1.2 mt heigh. But if u are using hose pipe then u may cast
as per the lenth of hose pipe reaches in side of col,which
also maintains I.S. specification of 1.2 mtr heightpouring
Thus we can cast col. more then 1.2 mtr. height. Generaly
hose pipe may be inserted up to 2.0-2.5 mtr depth in col.
and we can cast up to 3.7 mtr height of col.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / jhulzkee
1.5m since the max drop of concrete should be 1.5m height
to avoid seggregation of aggregates.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / girish rawat
you can cast up to 4 mts of column if you have reqd
supporting system for the same. As for the IS you cannot
pour concrete more than 1.5 mts as segregation and self
compaction takes place. For the columns you there is no
issue as the concrete doesn't drop to the bottom at once. it
is interrupted by stirrups all the way.
This is based in practical experience and we have got it right.
Secondly nowadays there is Mivan Shuttering where you cast
the entire slab and column at one stroke.
Keep moving with new technology, you will save time and the
quality will be better if the mix is homogeneous lesser joints
| Is This Answer Correct ? | 4 Yes | 3 No |
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
what are the challenges of being a team leader and a supervisor?
Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so calculate the total cost of labour and also explain in detail...plz ans me immadiately i am hurry Thanx
1) why bent up are provided at l/4 or l/5 distance not at l/8or l/10? 2) why extras are provided in beams at top and why upto 0.3l distance max.? 3) why chairs are provided in two way slab?
How to calculate compressive strength of concrete?
acceptance criteria for concrete works
Define What is unit weight of normal concrete?
what r remedies taken for foundation in black cotton soils..??
what is the length of a steel bar when it buy for the site????
how to find the quantity of materials required for constructing a wall of length 10*5*.2m?
What is the cement content for 1m3 of M20,M25 concrete?
6 Answers Aishwarya Group, Omaxe, TI Construction,
What is hybrid foundation?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)