9*9 1:4:8 ratio using for p cc work please tell quantity
40mm aggregate ,sand &cement
Answer Posted / puneet
wt is 9*9 here?
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
How to calculate unit weight of concrete for m40 grade.
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
what is cross hair cursor?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What does civil engineering mean?
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
HOw much % of premium on DSR-2013 currently
How to find CN by using arcgis 9.3?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
how much cement and sand required for 100sqm of wall plastering in different proportions
Can we apply curing compound on ceiling (slab Bottom)
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
how much one carpenter can doing shuttering of slab in one day
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Which is the direction of negative angle?