Answer / toss
IN answer no 1 quantity of cement value is 0.02.. then why u multiply 0.02 with sand
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / vijay govardhane
Total area plaster: 3.05*3.05=9.3
(Convert area into sq.f):9.3*10.75=99.97
100/99.97=.9997(1 bag)..cement
..sand=99.97/100=.997
=.9997/17=0.058...brass
(17 is a standerd value of sand In single coat =17 cu.m)
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / rakesh kumar sinha
Total Plaster Qty.=.09cum
Cement 1cum=1440
Sand 1cum=1600
Ratio of cement and sand=1:5
so,
cement ratio=.02
sand ratio=.08
cement required
1440*.02=28.8kg
sand required
1600*.08=128kg
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / shaik's construction
For a wall of 10'x10' ( i.e LxH) Having 10mm thicness
mortar ratio 1:6
10' approx equal to 3m
vol of mortar = 3*3*0.01
=0.09cum
vol of cement = 1*0.09/(1+6)
=0.01286cum :-(cement for 1cum=1440kg)
:-amount of cement=0.01286*1440
=18.5kg.
amount of sand=18.5*6=111kg
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / anoop didwaniya
10'X10'=100 sft.
converted in to sqm.=100/10.76=9.29 sqm.
ratio= 1:5, 1+5=6
for cement----1/6 x 1.52=.25 m3 x 35.28=8.93/1.25=7.15
so 7.15 bag in a cum. so for 20mm thk.
for cum. 9.29 sqm x .020 mm = .18 cum.
therefore --7.15 x .18m3 = 1.28 bag answer
for sand------5/6 x 1.52=1.26 m3 x 35.28=44.68 cft./1cum.
so 44.68 x .18m3 = 8 cft answer
1.28 bag of cement
8 cft of sand. required in 10'10 wall with 20mm thk.
| Is This Answer Correct ? | 33 Yes | 34 No |
Answer / risadh
Formula=Volume*Density of material
Add- Shirinkage-35%to40%
Volume= plastering volume+Depression,joint&Wastage
Density=Cement-1440Kg/m3,Sand-1600Kg/m3
Shirinkage-35%to40%
Depression,joints&Wastage normally-20%of plastering Volume
Cement=(1/6*0.11124*1440)+(1/6*0.11124*1440)35%=
Sand=(5/6*0.11124*1600)+(5/6*0.11124*1600)35%=
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / jehan abid
how to calculate the cement sand and crush quantity in 6 inch slab?
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / rakesh sinha
Total Plaster Qty.=.09cum
Wastage 20%=.02cum
Total Qty.= .11
Cement 1cum=1440
Sand 1cum=1600
Ratio of cement and sand=1:5
so,
cement ratio=.0186
sand ratio=.0929
cement required
1440*.0186=26.76kg
sand required
1600*.0929=148.65kg
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / waseem ahmed
10' X 10' X 0.03937" = 3.937
1:5= 1+5 = 6 therefore
3.937 / 6 = 0.656 cft cement
3.937 X 5 = 19.67 cft sand
will be used to plaster your area
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / sabeehullah
10*10*.032=3.2
1+5=6
sum of ratio = 6
constant of cement per bag in cft = 1.25
1/6 = .166*1.54 = .255/1.25=.204 say half bag
| Is This Answer Correct ? | 0 Yes | 1 No |
In which grade of steel the laping length required is more,Fe 415 or Fe 500 ? and why?
What is the difference between oneway slab and twoway slabs
How many bags of cement will be required for 45.5 M^3 Concrete with the ratio of 1 Cement+1 Crash+ 2 Sand+1 Gravel?
0 Answers First MicroFinance Bank FMFB,
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
how much sand requires for Light weight blocks for 100sqft
state the main objectives of underpinning
How Can Calculate Plastering Quantities For 260.04 square meter by using CM 1:4 with 25mm Thick ?
How do you find the difference between 53&43 grade cement in site?
how many AAC blocks of size 600*200*225 mm are required for 1 cu.m of area
What is the roll of face bars in beams
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)