Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Dear Frds, How can i calculate the Steel for RCC Slab,
Please provide one Example also, so that i can understand
very well.
Ex: Area: 1320.0 Sft.(44' X 30')
Span: 15'(Default).
Column Size: 9"X15"(6 No.s 12mm Rods)
Please Provide Calculation Details.

Thankyou.
Satish


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.

19 Answers   DNA Infrastructure, HCC, L&T,


what is the bar bending schdule

7 Answers  


How to distinguish that the soil is clay, silt, sand & murrum at site. (just by looking at it with out doing the sieve analysis test??

3 Answers  


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

0 Answers  


five benefits of using standard terminology in the measurement process

0 Answers  


how many cubic feet in one unit of sand?

16 Answers   L&T, PSPCL, Ratna Infrastructure Projects,


what"s the ratio for M30,M35,M40,M80 grade concrete?

0 Answers  


As column is compression member then why we use steel to make it reinforced as it is already capable of taking compressive load?

2 Answers   MBL Infrastructures,


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

0 Answers  


2nd and 4rt angle elevation used in which country ?

0 Answers   L&T,


Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....

0 Answers  


beam is fixed at both end which is 8 m span carry udl of 10 kn/m at left half span.there is internal hinge at center.what is reaction at center

1 Answers   IES,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)