What is ideal location for cube casting, RMC vehical at
Ground Floor and Slab casting at 40th Floor
Answers were Sorted based on User's Feedback
Answer / balakrishna bedudoori
I think the ideal location for cube casting is near Slab
casting at 40th floor, because if we take concrete from RMC
vehicle at ground floor, free falling height of concrete
from the vehicle to the ground is generally more than 1.5m,
which can lead to seggregation of concrete, which is not
good for taking moulds.
| Is This Answer Correct ? | 5 Yes | 4 No |
Answer / prasanna
Since atleast 6 cubes are taken for a batch of concrete, it
is advisable to take 3 each at both location, so that we get
clarity on workability of concrete.Average result of these 6
cubes will hold good.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / jyoti ranjan
actually it should be what type of conc. we r going to pour at a area,weather it is M35 and above then it must be in g floor but cube must be cast at pouring point.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sobhanbabu
at the 40th floor only.pumping jurney takes nearly 10
minutes.during pumping heat generates.
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / sudhir shetty
Its at the ground floor because during pumping there will be
some loss of slurry etc which is calculated during designing
of structure after which required strength is calculated. If
its taken in 40th floor u will not get the perfect sampling.
| Is This Answer Correct ? | 0 Yes | 1 No |
what would be the design load of R.C.C Cooling tower per cell.?
How manu days after the casting of a slab another slab can be casted above it? what is the total curing time of a slab if ponding is not done on it?
WHICH BOOKS ARE AVAILABLE FOR CIVIL MPSC
how many kg reinforcement is required for G+ 1 roof slab of 1200qf slop slab with 5 inch thickness of house.
Why is concrete cube test carried out?
How to calculate the quantity of materials for M20 grade concrete
Why we select pile foundations
how new RCC roof joined with existing RCc roof
what is mix design
how many bricks are requir for one unit ho we will caculate
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
what is anchorage length,lap length and (dont remember the last one)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)