What are the customization settings in Copy control for
canellation of an invoice.
Answers were Sorted based on User's Feedback
Answer / abhishek
There is no requirement to maintain any copy control between
standard Invoice F2 and Cancellation Invoice Type S1 in
standard SAP System.
Is This Answer Correct ? | 12 Yes | 2 No |
Answer / durga
In Copy controls of Billing to billing (VTFF)
maintain copying requirements as 5-(header cancellation)
6-(Item Cancellation)
Is This Answer Correct ? | 4 Yes | 3 No |
Answer / pitabash, infosys pune
Yes there is no need to maintain any copy control for
Invocie cancel . It is automatically triggered by the
system.
Is This Answer Correct ? | 0 Yes | 0 No |
what are 16 fields in pricing procedure?
What happens to the material listing/exclusion if the payer is different from the sold to party?
In sales order I want text? What are the settings we can do?
How system carry outs availability check during sale order process?
What is a condition type? What are the two main groups of condition types?
After returning the materials In MMBE it shows the return material quantity is 0 Actually I have 3 storage location 1st one is son1 for finished materials,2nd one son2 for return materials and 3rd one son3 for scrap So 1st I made a sales order with quantity 20 with storage location son1 and made the delivery and invoiced. Now when i am checking the material through mmbe then i found 20 materials less. Now I am going to return material and made a sales order(va01-document type RE) and clicked with reference with sales order and next clicked on copy button Next I mentioned the order reason as poor quality and went to goto item level and specified another storage location as son2. Saved the sales order and next made the delivery-vl01n (with delivery type LR) and did PGR and saved the delivery. But when i am checking the material quantity in mmbe with storage location son2,at there I can’t find any return material.the return quantity is 0. So what is the problem in my configuration??
How to assign division to sales organization?
How is the 'shipping point' determined by the system?
what is cutover strategy.what you have done in implementation of your project.
The quantity of Inquiry is 50 but the quotation created on it has 40 qty and the inquiry document is complete. How do we control it?
what is a field catalog? where do we configure it?
What are the Manual conditons types used in Pricing? can any one tell me pls