without maintaining condition record for a particular material perhaps price is determine into sales document what could be the reason
Answers were Sorted based on User's Feedback
Answer / nag
pricing referecnce material means if the price is same for all the materials, instead of maintaining the condition records for all materials, first we've to maintain condition records for one material, and make this material as pricing reference material to other materials
Is This Answer Correct ? | 19 Yes | 0 No |
Answer / harun kondle
Maintain price reference material for that particular material..Which has pricing records
Is This Answer Correct ? | 8 Yes | 0 No |
Can we create a sales order without plant? Is plant is one of the parameter to create a sales order?
what are the reports u have generated with help of ABAP?
What is The difference between Base line configuration and final configuration?
Can you give 2 different free goods with one main item? If yes then how do you do this in SAP?
In real time what user name and password we use?
What is a company?
What is a client?
I ahve an experience of 1 yr 10 months in java. I want to make my career in the field of SAP SD about which I have knowledge only related to my project. Are there any chances for me to have a career in this?
What is the difference between ATP check and availibilty check how these reflect in sales order(which check system considers) what are the IMG settings for the same
What is item category and how is it determined?
Version Management for SD
Tell me the table for SD Sales Document Flow?