Do you have several alternative BOMs for a material,
depending on the manufacturing procedure or lot size, for
example (multiple BOM)?
Answer / sunil budhwani
yes you can have several alternative BOMs for a material,
only thing is you need to define every BOM with deiffrent
product structure type.
Is This Answer Correct ? | 5 Yes | 0 No |
How to move to the realization phase?
What are basic dates?
Explain transaction code KO88 or CO88.
I want to make a career in SAP-PP/QM from the existing manufacturing experence.
In cost controlling information system mention the fields that are listed in the list screen of the report?
What is the data you give in S.O.P screen?
Explain how ‘pp’ is ‘integrated’ with other modules?
Can't one material be assigned to more than one operation in a routing?
What are all the steps involved in Variant Configuration?
What is Planning time Fence?
What is user exist, customer exist, where can be used
What is special procurement & tell one special procurement briefly