1) What is the US payroll process
(plz give me detailed point 2 point ans,,, )
2) What User-exit ? why do we use this
3) what is the diff between Work schedule and Work schedule
rule?
4) What is Full cycle implementation(is it particularly for
one sub module as Payroll or total SAP HR ) ?
5) What is Time constraints ? why do we use this ?
6) What is Time evaluation process ?
ANS-1)we have 12 steps in US payroll process.which are
fallows below,
1.genaeral data.
2.basic data processing.
3.get previous result of VO.
4.import last payroll results.
5.determination of payroll modifier.
6.general processing of time data.
7.gross calculation & text processing.
8.garnishments:recalculation.
9.net processing.
10.processing month end accurals.
12.final processing.
ANS-2)user exits is nothing but, adding new functionality
to allready existing one, we are not modifing that, with
out effecting original source, we have 4 types of user
exits, which are fallows below,
1.menu exits.
2.screen exits.
3.filed exits.
functional exits.
Ans-3)work schedule:it defines the number of hours to be
worked for specific period.
work schedule rule: it assigned to periodic work schedule,
adn discription of planned working time, i.e.daily working
hours, working days,, monthly working hours, and anually
working hours.
Ans-4) full life cycle implimentation is nothing but, we
have fallow four phages for a full life cycle
implimentation in to SAP any module.which are fallows
bellow,
1.project preparation.
2.business bule print preparation.
3.realization.
4.final preparation.
5.go-live and support.
Ans-5)time constraint class defines a determinant of whther
a data record must be defined without time gaps/over
laps/collisions are permitted.
it indicates whther more than one infotype record may be
available at one time.we 3 types of time constrain classes,
which are fallowed below,
1.an infotype record must be avaialable at all times, with
no gaps.
2.only one record available at on etime with time gaps.
3.any number of records may be valid at one time and time
gaps are permitted.
Ans-6)the time evaluation process starts bellow,
1.once u run time evaluation, sytem checks whethr employee
is existed ot not.
2.then system checks, WPBP table, start date,end date of
time evaluation and action type.
3.then system checks the time evaluation whether it is
positve or negative according the time managemnt status
which has been maintained in IT0007 .
4.then system checks errors in positive/negative time
evaluation.
5.then system checks planned working hours, here system
reduces breaks and absences, system gets exact working
hours.
6.then system generates time types & time wage types for
regular/over time hours.
7.then system process the time quotas.
if u have still doubt on above answers u can mail me on
ckreddyg@yahoo.com.
Is This Answer Correct ? | 10 Yes | 1 No |
explain US tax Models
how did you integrate hr and fi briefly with screenshots to my email address:subrahmanyam_varanasisaphr@rediffmail.com
I want the t-code of that window where it asks for evaluation path. I want to generate the report in om.
What is meant by payscale structure? How did you configure payscale structure? How do you import payscale data from non SAP to SAP?.
what is fit gap analysis? how u can fit the gap? what u have to gather requirments?
What are the counting classes?
Which architecture does the sap system use?
can anyone explain me about variants in Time Management? I need help in some more things? I need help? can anyone guide me? my mail id :kiranm113@gmail.com.
How is a report executed in sap?
What is matchcode w used for in sap?
What is shift planning?
What is the use of object manager in OM and PA?