Q1. how we can cancel/delete invoice as well as order in sd?
Q2. how we can transfer stock from one plant to other plant
and from one storage location to other storage location?
Q3. what is BOM and whats the procedure to do it?
Answers were Sorted based on User's Feedback
Answer / rajesh
Ans1. First of all Billing document is never deleted, But
Cancelled. One can cancel billing document by VF11.
Ans2. We can transfer stock from one plant to another plant
by movement type 301.
movement type 301 (TF tfr. plant to plant) or a 302 TR
(reverse plant to plant).
303 is TF from storage to plant
305 is TF plant in storage in plant
From storage location to storage location.
311 Transfer posting storage location to storage location
in one step
The quantity is transferred from unrestricted-use stock of
the issuing storage location to unrestricted use in the
receiving storage location.
Possible special stock indicators:
E, K, M, Q
See also 321, 343, 349, and 455 for other stock types
313 Stock transfer storage location to storage location in
two steps - removal from storage
The quantity is transferred from unrestricted-use stock of
the issuing storage location to stock in transfer in the
receiving storage location.
Possible special stock indicators:
None
315 Transfer posting storage location to storage location
in two steps - placement in storage
In the receiving storage location, the quantity is
transferred from the stock in transfer to the unrestricted-
use stock.
Possible special stock indicators:
None
Ans.3. BOM is bill of materials. Bill of Material is an
complete list of components that make up a finished
manufactured product. The Bill of material consists of the
item number of each component, quantity required in the
manufacture of a component and the unit of measure of the
item. Such individual components which make up a
manufactured product has a specific name in SAP. They are
called Bill of Material Items BOM items. SAP R/3 allows
creation of various categories of BOM Bill of Material.
Some of the categories of BOM include, document BOM,
material BOM, equipment BOM, Sales Order BOM and Functional
location BOM.
In SALES:-
A bill of material (BOM) describes the different components
that together create a product. A BOM for a bicycle, for
example, consists of all the parts that make up the
bicycle: the frame, the saddle, wheels, and so on.
Process Flow
When you enter the material number of a bill of materials
that is relevant for sales order processing, the system
displays the material that describes the whole bill of
materials as a main item. The individual components are
displayed as lower-level items.
There are two ways to process a bill of materials in Sales.
Once you have entered a bill of material in a sales order,
the system runs pricing, inventory control, and delivery
processing at:
- Main item level if the material is assembled, or
- Component level if the material is not assembled
The type of processing used by the system is determined by
the item category group that you enter in the material
master record for relevant materials.
Processing at Main Item Level
If you want the system to carry out pricing, inventory
control, and delivery processing at main item level, enter
ERLA in the Item category group field of the Sales: sales
org. 2 screen in the material master record of the finished
product. This means that the components only function as
text items and are not relevant for delivery. The following
graphic shows how a bill of material is processed at main
item level.
Processing at Component Level
If you want the system to carry out pricing, inventory
control, and delivery processing at the component level,
enter LUMF in the Item category group field of the Sales:
sales org. 2 screen in the material master record of the
finished product. In this case, only the components are
relevant for delivery. During processing the system
automatically creates a delivery group. The latest delivery
date among all the components becomes the delivery date for
the entire delivery group.
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / vijaydahiwal
1
u can cancell billing doc by vf11
2 to transfer from plant to plant use t code migo_tr
Is This Answer Correct ? | 1 Yes | 0 No |
Howmany chart of account we can assign to a company code.
Explain the difference between SAP 4.7 and ECC 5.0?
I am having 2.1 yrs of experience in sap sd.can any one send me a sample of perfect resume to my mailid. vvnanda700@gmail.com
Is it possible to block a material for sales order so that it should not give any yellow exclamation-warning message....in other way it should give an error message so that we can not proceed further? Also..is it possible for the bloking customers in the same way...if so ..how?
How can i explain RICEF with example in interview?
How you identified whether this order is make to order or maket to stock in Order Level ?
5 Answers Tieto Software Technologies,
Hi, Can anyone proivde the soluiton for the below senirio, thanks in advance. We are providing test services to various sites of a corporate. Now, we want to bill as a single bill point i.e. Corporate office. Single bill for each site will be generated. E.g. Panac Labs, New Delhi Head Office Panac Labs, Mumbai Lab at Mumbai Panac Labs, Kolkata Lab at Kolkata Panac Labs, Indore Lab at Indore In above case, we are cattering services to all four locations. However, New Delhi is the Head office and Lab too. Hence we will issue four bills addressed to Panac Labs, New Delhi. Outstanding and debtors will be maintained on A/c of Panac Labs, Head office. We also want to maintain sub- ledger base on sites
When you think of the five possible elements necessary for the account determining during posting of a sales invoice – where from does the system get the information?
If we dont give the horizan period in dynamic credit check what will happen?
Question --- What are the Steps for the End-user Training in SAP-sd module?
Hi , I am 38 Yrs old and having 10 years of experience in trading industries like Computer hardware,software and steels and education field .I am having some exp of working in SAP as core team also. i want to know is there any limitations of AGE in SAP .
In a Third party Sales order process company is not delivering the goods directly to the customer so why there is need to do Goods Receipt Process T-code :(MIGO) transaction in SAP as there is no physical delivery of goods is taking place in Company? Even if we are doing it symbolically in SAP system then the stocks are going to pile up, so why we need to do MIGO transaction. Tell me the logic behind it? Please reply asap... Eagerly awaiting for your response? Thanks in advance.