what is the diff. between NETCH,NETPL AND NEUPL
Answers were Sorted based on User's Feedback
Answer / sri
NEUPL-Regenerative Planning (Planning of all MRP-relevant
Materials)- the systems plans all the materials in a plant.
This is mainly useful for the first planning run or also
during day-to-day planning run if the data consistency
cannot be guaranteed
NETCH-Net change for total horizon( to execute MRP for only
those materials which have undergone MRP relevant changes.,
for eg., due to goods issue, new sales orders or changes to
BOM structure.)
NETPL-Net change planning in the planning horizon( planning
of all materials to which an MRP relevant change has been
made within the planning horizon, Planning within the
planning horizon)
Is This Answer Correct ? | 26 Yes | 0 No |
Answer / senthil
NETCH means Netchange planning that is the planning can be
changed at any point of time. After changing the planning,
again you can run mrp and reschedule the orders.
NETPL means Netchange Planning in the planning horizon.
Once mrp is executed, any change in the planning can be
done only within the planning horizon.
NEUPL means Online regenerative planning
Is This Answer Correct ? | 20 Yes | 0 No |
Answer / prasanna
NEUPL-Regenerative Planning, This is carried out most of
the times only when the planning is being carried out for
the first time after establishing the SAP system.
NETCH-Net change for total horizon, plans materials to
which MRP relevent change has been made
NETPL - Net change planning in the planning horizon, plans
the materials withing the defined planning horizon
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / pravin
NETCH-Net change planning. it is carried out for thoes mat.
which are subjected to change in BOM qty., or bom structure
NETPL=thoes mat. which are subjected to change within
planning horizon they are processed by using this Key.
NEUPL= when planning run is carried out for the first time
for any sp. mat. then it is used.
Is This Answer Correct ? | 1 Yes | 4 No |
Answer / nanduri k. prasad
NETCH: It net change planning done for the most recent
changes taken without considering the warehouse stock.
NETPL: It is the plan when gross requirements are to be
considered including the ware house stock.
NETPU: It is the plan considering the planning horizon.
Is This Answer Correct ? | 0 Yes | 6 No |
Describe control key utility & also standard key ? how many fields can be configured for standard value key?
What is Variant configuration?
Product Costing Run is over. Now If I add one more rawmaterial for that material also it has to included & run the cost. But it is not happening?
What MRP does with Capacity overload
What is batch management
what you heard about super BOM
What are the different type of BOM usage?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Difference between different strategy groups.
What is the purpose of using capacity planning?
What is end user training
How the process time is calculated in a wc when both labour, machine categories exist?