Answer Posted / senthil
NETCH means Netchange planning that is the planning can be
changed at any point of time. After changing the planning,
again you can run mrp and reschedule the orders.
NETPL means Netchange Planning in the planning horizon.
Once mrp is executed, any change in the planning can be
done only within the planning horizon.
NEUPL means Online regenerative planning
Is This Answer Correct ? | 20 Yes | 0 No |
Post New Answer View All Answers
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
What is SOP and types of SOP?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
What does the use of ms70 followed by mcec get you?
What is qualification deficiency?
Explain the process of Material costing.
Explain 'mrp' (material requirements planning)?
How you get the ticket?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
Explain why there is need of production version?
Differentiate ‘variant bom’ from ‘multiple bom’?
What is the use of t-code cs20 in bom?
What happens to planned after it has been converted into production order ?
Explain about rough cut planning
What is mrp list and what is the use of it?