Answer Posted / senthil
NETCH means Netchange planning that is the planning can be
changed at any point of time. After changing the planning,
again you can run mrp and reschedule the orders.
NETPL means Netchange Planning in the planning horizon.
Once mrp is executed, any change in the planning can be
done only within the planning horizon.
NEUPL means Online regenerative planning
| Is This Answer Correct ? | 20 Yes | 0 No |
Post New Answer View All Answers
Control keys
Difference between base unit of measure, production unit, order unit
What is Production scheduling Profile and use of it?
Explain Planning file entry.
What is Individual and collective requirements and differecne between them in MTO scenario?
How to create prt master records?
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
What is the purpose of using capacity planning?
What are sequence, parallel, overlapping, splitting and where can we assign these
List out the basic procedure for dispatching operations in capacity leveling?
What are the basic dates?
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
What is the recruitment cycle?
What is Planning time Fence?
Where have we to specify the teardown time in one operation?