Explain source inspection.
No Answer is Posted For this Question
Be the First to Post Answer
Where we have to specify the teardown time in one operation?
Do you want to use one BOM to represent several similar materials (closed variant BOM)?
What is processing class, where we do them and why?
What is a ‘routing’ in pp?
What is time phased Planning?
1000 pieces you run mrp on that time use md02 or md01
Explain the mrp controller and their uses.
How mrp (material requirement planning) types are classified?
What is alternate item group?
What is BPP? in detail.
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What is the output of mps run ?