What is trigger Point. What are the setting required to trigger one action?
Answer / sarang
a trigger point can be created to generate a new Production order (without material) out of the production order. The trigger point will be created for function “Create order with reference” and in parameters, Reference operation set and order type will be assigned.
Is This Answer Correct ? | 0 Yes | 0 No |
What is requirement class and requirement type?
what are the problems you faced in MRP?
What are SAP Configuration Steps along with Tcode and Master data for New Product Development and Introduction? Please give step by step answer along with T code for each step and master data and Org. element required for each step. Thanks in advance.
2 Answers Accenture, IBM, TCS,
In which context do you use bills of material? [ ] Material Requirements Planning [ ] Execute Production [ ] Goods Movements (to Help Data Entry) [ ] Product Costing [ ] Development/Engineering/Design [ ] Documentation [ ] Others
What is inventory
how to define formulas in work center
What are the three 'mrp procedures'?
What are mandatory fields for PP configuration
What is the use of data in work centers?
How to create prt master records?
Splitting of production order & product version
what are Standard keys