What is default values at work center
Answers were Sorted based on User's Feedback
Answer / dinesh kumar
You can enter default values for operation and sub-operations in work centers. The default values are then copied when you assign the work center to the operation or sub-operation.
By entering default values you reduce the effort necessary in editing operations, since the values are stored centrally and you do not need to enter them in each operation.
Default values in work centers are for instance:
Wage type and wage group
Control key
Standard text key
Suitability
Setup type key
Activity type
Units for the standard values
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / dinesh kumar
The following rules apply when transfering default values to an operation at a work center:
If the control keys for the old and new work centers...
then...
do not agree
all values from the old work center are deleted. Only the values from the new work center or the values from the dialog box Work Center Default Values are copied during replacement.
agree
the values from the new work center or the values from the dialog box Work Center Default Values are copied during replacement. The fields left empty are filled with values from the old work center.
Is This Answer Correct ? | 1 Yes | 0 No |
Explain different inspection type you used .
What is 'capacity planning'?
Have idea about variant configure
2 Answers Accenture, ASD Lab, Cap Gemini, IBM, Sunbeam,
Tell bom header level & component level
what do you mean by planning time horizon
You want to insert an inspection check point at the end of an operation. How would you do that?
What is Material status and which view of the material master it is available?
What is alternate item group?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
How to delete a group of products that was created in screen mc84 ?
what is pegged requirements