what are the problems you faced in MRP?
No Answer is Posted For this Question
Be the First to Post Answer
Hi Sir, Please guide me i am an BSc computer science graduate with MBA in Agri business having 3 years of exp in Food Processing Industry in Production please advice shall i persue with SAP PP? Many thanks
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.
What r different reduction startergies in SAP PP?
How many levels of Flexible Planning are there?
Have idea about variant configure
2 Answers Accenture, ASD Lab, Cap Gemini, IBM, Sunbeam,
when we need to close the production order, before the manufacturing or after the manufacturing
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
One component 2 times assign to bom
• How are basic order dates determined?
Mention what is the use of t-code cs20 in bom?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
Difference between MTO & MTS
1 Answers Cognizant, UT Pumps,