Answer Posted / dinesh kumar
You can enter default values for operation and sub-operations in work centers. The default values are then copied when you assign the work center to the operation or sub-operation.
By entering default values you reduce the effort necessary in editing operations, since the values are stored centrally and you do not need to enter them in each operation.
Default values in work centers are for instance:
Wage type and wage group
Control key
Standard text key
Suitability
Setup type key
Activity type
Units for the standard values
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What are all the settings done for configuring the integration of pp with fico?
How to attach a drawing for a material to bom ? Is it possible ?
How do you restrict the data to be entered in the payroll area?
What parameters you maintain in “plant parameters” in configuration?
What are the MRP master data?
list the important tables used in pp.
Can we create production order without bom and routing ?
What is Individual and collective requirements and differecne between them in MTO scenario?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
Explain how to create prt master records?
How does sap know that an operation has components as indicated by the component allocation indicator?
Question related to Production order status or status profile?
What happens to plan after it has been converted into production order?
What is the data you give in S.O.P screen?
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?