What parameters you maintain in “plant parameters” in configuration?
No Answer is Posted For this Question
Be the First to Post Answer
You want to create object dependencies in a bom for configurable materials? How would you navigate?
define the CRP,MRP,DRP ?
What is the use of t-code cs20 in bom?
For REM the settings are dependent or normal?
How costing is affected the pp?
Mention what is the production process in sap?
Explain what is plm (product lifecycle management) in sap pp and what is the use?
Do you use group BOMs for engineering/design and copy or assign them to plants at implementation?
what is difference between group BOM and BOM group ?
what is recurssive BOM ?
Difference between standard cost and variable cost.
Hi, I have run the standard cost estimate for one product. Can any one tell me the planning steps for 100 products. Sravan