If the scenario is''Party is supplying some material we
have to do the some processing operation on it, how it cab
be handled in SAP"
Answer / ajit kumar santi
You have to use Sub-contracting in MRP-2. proc type-F and Special proc type-subcontracting
Is This Answer Correct ? | 2 Yes | 0 No |
Explain Planning file entry.
What is the planning horizon?
In implementation stage tell some standard scenario before AS-Is & TO-BE
What is MRP Area or How can I excluede one storage location stock from MRP?
What are the different type of BOM usage?
Integration between PP and SD module.
Mention what is the use of t-code cs20 in bom?
How to create object dependencies in a bom for a configurable material?
How to move to the realization phase?
What is mrp group and what is the use of it?
What is the configuration done for Order type dependent parameter and confirmation parameter
What is phantom item & sub contracting