If the scenario is''Party is supplying some material we
have to do the some processing operation on it, how it cab
be handled in SAP"
Answer Posted / ajit kumar santi
You have to use Sub-contracting in MRP-2. proc type-F and Special proc type-subcontracting
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
In lsmw which is the most important step?
list the important tables used in pp.
Explain why there is need of production version?
Difference between byproduct and co-product.
What is MRP Area or How can I excluede one storage location stock from MRP?
Different types of consumption based planning.
How to create opbject dependencies in a bom for a configurable material?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
In lsmw which is most important step?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
How to attach a drawing for a material to bom ? Is it possible ?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
Why and how you calculate WIP?
What is Material status and which view of the material master it is available?