Answer / chandra sekhar
Quick sizer tool
Before installation or starting project,the management people estimate the hardware based on client requirement.like how many end users and performance etc.. using this tool they will calculate.it is available in service market place.
Prerequisties
we have to install java,sap libraries,configure ip address,modify host file ,service,limits.config,sysctl,give path of sap_lib,ld_library_path,java_home.
Is This Answer Correct ? | 2 Yes | 0 No |
what are the previleages before applying support packages.
why can't we convert spool wp to dialog or backgrd in operation modes
What is supplementation language?
How many types of log file in Oracle ?
what type of files are created during the export ?
If a background job runs more than the time it should be completed normally then what are the actions to be performed?
I need to change the Company address parameters of a user. The path is SU01 -> <Username> -> Change - > Address Tab - > Display Icon in Company Address section. In the new screen, i see a preview section icon; on clicking which, I can change the parameters such as "Sending Country"; "Street/PO Box number" and number of lines in the resulting pop up. Here though i change the parameter "Street/PO Box number" field to 'S' ( Street has priority over PO Box), its changing again to 'P' (PO Box has priority over street) only. In the help section it is written that if we set the user parameter (tcode SU3) LND1 to the desired country we can control the user specific Sending Country with the desired value else it takes the Sending Country of the Company defined by default. But no such parameter has been given for Street/PO Box number so that we could change its value atleast there. Someone suggest me how to change the Street/PO Box number of the Address format for a user to the desired value.
What is the role of “ application server” ?
What is an interface in SAP?
Do you know logon groups at which situation will be created logon group?
If one background process took long time to run other than the usual time , what are the areas you will investigate other than SM37 ?
which modules need to be monitored by BASIS consultant in the organization?