What is Replenishment lead time?
Answers were Sorted based on User's Feedback
Answer / rahu;
Total time for the in-house production or for the external
procurement of a product. In in-house production, the
replenishment lead time is determined to cover all BOM levels
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mahendar
Replenishment Lead time is the time for material to become
available either from external procurement or in house
production.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / chitta
The time taken by the business to produce the material or
procure to make product available
Is This Answer Correct ? | 0 Yes | 0 No |
Answer /
It is a time taken process to make finished goods and dispatch
to the customer.
(Manufacturing time + Quality inspection time)
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ashok reddy
It is the total time taken to manufactured the goods and make the goods ready for dispatch is known total replenishment lead time
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / dave
I have yet to see a correct answer. IT folks nearly always get it wrong. Some of the answers above are only correct in specific circumstances. People always miss the important of delivery/ship frequency. A transit and goods receipt time could be 7 days total. But if parts are being shipped from a supplier daily, the RLT for use in a formula, is 1 day. There will be 7 days of inventory in the pipeline. Not every material is Make to Order. It’s counter intuitive, but mostly just logic once understood.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rajeshwaran
Its is the time taken to fill the the used stock. The fill
may be from supplier or through manufature
Is This Answer Correct ? | 3 Yes | 5 No |
Answer / mahesh
Srikanth is right..but If u r using Inhouse production time
then Planned delivery time is not applicable since planned
delivery time is used if u r procuring the material from
outside. We specify it as Procuremtn type in Material
Master.
Is This Answer Correct ? | 3 Yes | 9 No |
Answer / sailaja
Replenishment Lead Time is the difference between Stock
released from the picking location time - Stock replaced in
picking location time from stock reserved location time
Is This Answer Correct ? | 0 Yes | 8 No |
Tell me LSMW important step?
When you save a sales order what's the background process which takes place??
In SAP-Sales & Distribution what is the landscape of your project, How to answer this question practically?
What is condition exclusion?
Can anyone explain an example of a real time ticket?
How to Handle SEZ Sales in SAP with ARE-1?
In IPO process without MIRO can I create invoice to customer?
What happen when u save cash sale and what are the postings done after saving it (which GL account will be updated)
In material determination how you configure the system should propose when product A is not available then only system substitute with product B. If A is available 60% quantity. How do you do in the situation?
Name at least five features that you can control for the schedule line category? Relevance for delivery, availability check, transfer of requirements, goods movement, purchasing and incompletion log.
what is the link/control between sales and distribution and quality??
in third party customer raise the order qty 10. but vendor sent the goods qty 6 only.how can know the customer receiving quantity.